When
time-to-market is key - Net Load™ is the answer.
Where financial and staff resources are scarce - Net Load™
brings automation. When systems need to be brought into production
quickly - Net Load™ can help.
The Net Load™ Solution by BottomLine Data Solutions
- the next generation OSS (Operations Support Systems) Equipment
and Circuit Data Load Solution. Harnessing the power of the CircuitWise™
Suite and API integration, Net Load™ allows Communications
Carriers to rapidly and accurately store, export and load targeted
data into their OSS. The most common scenarios where customers
benefit most from Net Load™ include:
-
Greenfield
system implementation
-
Targeted
data update or introduction
-
System
conversion
-
System
upgrade
-
Load
of acquired network properties
-
Load
of individual network locations
Gone
are the days of manually entering OSS corrections by hand. With
Net Load™, foreign network site information,
cross-connect, circuit and other key provisioning data can instantly
be uploaded by a click of the mouse. Net Load™
also increases OSS data integrity while removing the data entry
layer, but most importantly Net Load™ saves Carriers
two valuable resources - time and money.

Figure
1: Net Load Data Flow
As
an example, Figure 1 above, displays how data is received and
flows through CircuitWise™ during the course
of a 'greenfield' system implementation. Specifically, data passes
through the Solution as follows:
-
Step
1: parts catalog and specification information is extracted
from the foreign data environment via the WiseExtract module
of CircuitWise™
-
Step
2: parts catalog and equipment specification data obtained
via WiseExtract™
or via API integration, is stored in the CircuitWise™
database for later use
-
Step
3: parts catalog data site audit files (equipment and
circuit) are loaded into the MobileMap mobile computing module
of CircuitWise™
-
Step
4: relying in part on the benefits of scanning technology,
and readily available parts information, network locations
are efficiently built out 'from scratch' a site at a time
- entirely electronically
-
Step
5: equipment and circuit 'as-built' data is captured electronically
in MobileMap
-
Step
6: here, the audited field data is electronically transferred
to the CircuitWise™
database
-
Step
7: audited data as captured in the field (or via equipment
polling) is previewed by data administrator
-
Step
8: the WiseAnalyze reconciliation engine embedded within
the CircuitWise Suite sets the stage for data
migration
-
Step
9a: limited data (if any) updated in the OSS utilizing
CircuitWise™ reports
-
Step
9b: equipment and circuit data auto-populated in the OSS
via API integration
-
Step
10: the WiseAnalyze rack face drawing representations
pertaining to the site are automatically updated as indicated